Lesiter Construction phone number

Blog

San Jose Remodel and Additions- Phase 3

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In this phase we have completed the majority of the brickwork and we have started reconfiguring the new interior layout of the existing home. Due to the age of the existing brick we were not able to match the exact color. We will have to apply a custom formulated textured finish to match the existing brick. Once this is complete you will not be able to tell the difference between the old brick and the new brick. We will start drywall next week followed by custom cabinetry in the kitchen, lounge and bathrooms. Please stay tuned for our next post as it will include the finished brickwork, cabinetry and other interior finishes.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

 

Sincerely,

Jason Leister

Riverside Master Bath Remodel- Project Completion

Thank you for following us as we moved through the various phases of this project. We hope that our posts help educate our followers so that they can make informed decisions regarding any projects they may wish to engage in. We hope you enjoyed the pictures of all the completed finishes for this bathroom remodel. The client was very pleased with the attention to detail and extraordinary level of quality.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

 

Sincerely,

Jason Leister

San Jose Remodel and Additions- Phase 2

no images were found

 

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase two we completed the dry-in of the front addition, rear addition, and open patio. The electrical, plumbing, and HVAC roughs are close to completion. We are preparing to start the brick exterior once the windows are set early next week. The next phase will include the interior demolition of the main house baths, kitchen, lounge, and common areas in preparation for new flooring, cabinetry, countertops, molding, and doors. The best is yet to come.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

 

Sincerely,

Jason Leister

Fleming Island Condo- Structural Water Intrusion Repair

 

Please follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase one we have removed the exterior stucco to expose the damage at the source and surrounding areas affected by the leak. We have thoroughly evaluated and repaired the cause of the leak as well as replaced the structural components of the garage door opening. All inspections have passed and we will be reapplying the stucco finish next week. Once the stucco is complete we will allow adequate time for it to cure before we prime and paint. Stay tuned for final pictures of this water intrusion repair project.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

 

Sincerely,

Jason Leister

San Jose Remodel and Additions

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase one we demolished specified areas of the existing home in preparation for future additions. The finished floor elevations were set and slab preps are ready for local municipality inspections. Once inspected we will pour the slabs and rough frame the additions. Our next post will include pictures of the rough framing and slab work.

 

Sincerely,

Jason Leister

Riverside Master Bath Remodel

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase one we gutted this bathroom down to the studs. We updated the plumbing, electrical, reconfigured the floor plan, and relocated the toilet. We will be installing a custom built cabinet, countertop, shower stall with enclosure, and tile throughout. This bath was original to this 1928 built home located Riverside. Stay tuned to see how we transform this bathroom into a contemporary work of art.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Sincerely,

Jason Leister

Orange Park Florida Room Addition and New Driveway

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase one we formed and poured the footers and slab of the room addition as well as the new driveway leading to the rear Florida room addition.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

Sincerely,

Jason Leister

 

Bathroom Renovation in the Mandarin Area: Before and After Pictures

This once 80’s style bathroom has been completely transformed into a modern work of art. We ran into some unexpected termite damage that was immediately taken care of and did not stop us from knocking this project out of the park and the customer could not be more satisfied with the finished product.

Looking to have your bathroom, kitchen, or home remodeled and make your dreams a reality? Please give us a call with any inquiries, as it would be our pleasure to answer any questions.

Bathroom Renovation in the Mandarin Area: Update

We have completed the necessary demo work and are now ready to form and pour the new sunken shower pan. Once this is complete then we will start to install the finishes. Stay tuned and watch this project start to come together. If you have any questions regarding any aspect of construction related to this project or any other project please feel free to reply back to us and we will be happy to answer all of your questions. Thanks, Jason Leister.

Bathroom Renovation in the Mandarin Area

Follow us to see this 80’s style bathroom transformed into a stunning and stylish work of art.

 

« Previous PageNext Page »

Copyright © 2018 Leister Construction. All Rights Reserved.

Our most popular construction services:

eLYK innovation, inc. Jacksonville, Florida - Web Design Company