Lesiter Construction phone number

Blog

Maitland Florida Custom Design and Build

Thank you for following us as we moved through the various phases of this project. Here are pictures of the Lagoon Pools structural elements and current elevations for this project. We can not wait to see the Lagoon Pool completed by Lucas Lagoons. The stone work will tie into the rear elevations stone work and summer kitchen. It will be an amazing show piece once completed. We will post more pictures as this project progresses.

Silver Creek – Neighborhood Entrance Sign Additions

Montclair Covered Porch Addition

Switzerland area Custom Built-Ins

Fruit Cove Kitchen Remodel

 

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase one we completed the necessary demo work to remodel this kitchen into the custom designed plan configurations with all new appliances, custom cabinets, and countertops. The custom cabinet install is complete and the templating and cuttingĀ of the countertops is in progress and will be installed this week. Please stay tuned for the finished product coming soon.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Sincerely,

The Leister Construction Team

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

Miramar area Custom Garage Remodel phase 2

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase two we have completed the necessary framing and have finished installing the new custom built garage door. In the final phase we will wrap this project up by painting the exterior and sealing the garage floor.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Sincerely,

The Leister Construction Team

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

San Jose Remodel and Additions – Phase 5

 

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In this phase we have completed all of the brick work, hard wood floors are in progress, custom cabinetry is installed and will be templated for the countertops, tile work in the bathrooms are in progress, and the interior trim work is nearly complete as well. The interior and exterior painting is also in progress and we have installed the ornamental iron gate in the new dining room area. Please stay tuned as within the next couple weeks we will be putting the finishing touches on this project and wrapping it up.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Sincerely,

The Leister Construction Team

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

Miramar area Custom Garage Remodel

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In phase one we will begin the removal of the existing double garage doors. Then we will start the necessary demo and framing work to transform this double garage door into a single opening to accommodate a custom built garage door. We will then finish this project up with repairing some minor wood rot damage and painting including sealing the garage floor.

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Sincerely,

The Leister Construction Team

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

San Jose Remodel and Addition – Phase 4

 

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In this phase we have completed the necessary demo work in preparation for the new hardwood flooring install, custom cabinetry, tile work, and interior trim. We are currently finishing the custom brick arched entry way and will post pictures soon.

 

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

 

Sincerely,

The Leister Construction Team

 

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

Maitland Florida Design and Build Custom Home – Preliminary Sketches

Follow us as we progress through the different phases of this project. We hope that you enjoy the pictures and posts. In the design phase we are putting together the finishing touches of the preliminary sketches and floor plans to get approval from the home owner before we move into engineering. Once engineering is complete we will submit the building package to the Building Department for plan review. This is to ensure compliance of the Florida Building Code.

Prior to designing any home you must be aware of the setback requirements, lot coverage restrictions, or easements on the proposed building site. These items can have an impact on the size and design of your home

Please contact us with any questions that you may have regarding this or any other project. Thank you for following Leister Construction LLC.

Connect with us on FaceBook

Connect with us on Houzz

Connect with us on LinkedIn

Connect with us on Pinterest

 

Sincerely,

Jason Leister

Next Page »

Copyright © 2017 Leister Construction. All Rights Reserved.

Our most popular construction services:

eLYK innovation, inc. Jacksonville, Florida - Web Design Company